TPA Master Plan
- August 18, 2022 Airside D Outreach Event
- August 18, 2022 Airside D Outreach Event, Attendees Info
February 3, 2022 Board Meeting MPU Baseline Forecast PowerPoint
- November 4, 2021 Board Meeting MPU PowerPoint
- April 25, 2022 CEO State of TPA PowerPoint Presentation
- April 25, 2022 MPU PowerPoint Presentation (English)
- April 25, 2022 MPU PowerPoint Presentation (Spanish)
- Nov. 16, 2022 CEO State of TPA / MPU PowerPoint Presentation (English)
- Nov. 16, 2022 CEO State of TPA / MPU PowerPoint Presentation (Spanish)
- July 25, 2023 MPU PowerPoint Presentation (English)
- July 25, 2023 MPU PowerPoint Presentation (Spanish)
In 2016, the HCAA initiated an update to validate the Phase 2 and 3 project elements to determine if conditions in 2016 matched the original findings of the 2012 AMPU. The intent was to verify forecasts, capacity needs and evaluate alternatives for the following key areas:
- Roadway/Curbside
- All Airsides
- Main Terminal
This new study is referred to as the 2012 Master Plan – 2016 Addendum. The documents serve as the consolidated guiding document representing all studies and validations completed. Not all components of the 2012 AMPU were restudied in this 2016 Addendum. If a project component was not restudied, the 2012 AMPU remains as the recommendation and will be referenced as such.
Section 1 of the 2016 Addendum provides a general overview of the process and updated project component recommendations that are different than the previous 2012 AMPU. Sections 2‐5 provide the detailed analysis and process concepts that were studied during the entire 2016 Addendum.
2012 Airport Master Plan - 2016 Addendum - Volume 1 (9.22.17)
2012 Airport Master Plan - 2016 Addendum - Volume 2 (9.22.17)
2012 Airport Master Plan - 2016 Addendum - Volume 3 (9.22.17)
- Master Plan Phase 2 renderings
- Master Plan Phase 2 animations
HCAA Strategic Business Plan 2017 Update
Phase 2 press release - 4.18.17
Phase 2 - Board Workshop Presentation - 4.18.17
Phase 2 Open House Press Release - 4.18.17
Master Plan Phase 2 Outreach - 6.9.17
June 9th Attendees Original Sign-In Sheets
Master Plan Outreach Flyer - 6.27
- Master Plan Networking Sign-in Sheet - 6.27.17
- Master Plan Networking Event PowerPoint Presentations - 6.27.17
The 2012 Airport Master Plan Update (AMPU) began as a study designed to maximize the capacity and longevity of the existing Main Terminal facilities, while maintaining the level of service for which Tampa International Airport (TPA) is known. The 2012 AMPU was a holistic study of all Airport facilities. It was developed into a comprehensive 3 phase Capital Improvement Program:
Phase 1 – Decongestion
Phase 2 – Enabling
Phase 3 – Expansion
The Hillsborough County Aviation Authority (HCAA) Board adopted and approved the 2012 AMPU on April 4th, 2013.
-
CATEX TPA Taxiway J Bridge Project
TPA FONSI Letter
TPA FONSI 2-13-14
Skanska MTAC Redevelopment Program.pdf
Austin Commercial Invites W/MBE subcontractors to submit pre-quals (11-10-14).pdf
Graphical Renderings 11-5.zip
Full Environmental Assessment 32MB.pdf
Finding of No Significant Impact.pdf
Attendance Sheet - Master Plan Subcontractor Outreach and Opportunities Fair (6-26-14) 176K.pdf
Master Plan Executive Summary (11-22-13) 23.05MB.pdf
Master Plan Update - Volume 1 (11-22-13) 44.16MB.pdf
Master Plan Update - Volume 2 (11-22-13) 82.5MB.pdf
Master Plan Update - Volume 3A (11-22-13) 43.22MB.pdf
Master Plan Update - Volume 3B (11-22-13) 29.22MB.pdf
Master Plan Public Meeting Presentation (11-21-13).pdf
Business Plan PowerPoint Presentation (11-21-13).pdf
Official Statement Refunding Transaction (11-15-13).pdf
Report of the Airport Consultant (11-15-13).pdf
Business Plan Final (11-15-13).pdf
A New Day in Tampa Bay, Master Plan 2012 Book (5-7-13).pdf
Graphical Renderings.zip
Master Plan Fact Sheet (4-4-13).pdf
Master Plan Update Press Release (4-4-13).pdf
HCAA Board Briefing (4-4-13).pdf
Master Plan Update Public Meeting (2-13-13).pdf
HCAA Board Briefing (12-6-12).pdf
News Release on Oct. 25 Public Meeting (10-22-13).pdf
HCAA Board Briefing (10-4-12).pdf
Vision 2020 Master Plan Update Public Meeting (4-11-12).pdf