TPA Master Plan
- August 18, 2022 Airside D Outreach Event
- August 18, 2022 Airside D Outreach Event, Attendees Info
- November 4, 2021 Board Meeting MPU PowerPoint
- April 25, 2022 CEO State of TPA PowerPoint Presentation
- April 25, 2022 MPU PowerPoint Presentation (English)
- April 25, 2022 MPU PowerPoint Presentation (Spanish)
- Nov. 16, 2022 CEO State of TPA / MPU PowerPoint Presentation (English)
- Nov. 16, 2022 CEO State of TPA / MPU PowerPoint Presentation (Spanish)
- July 25, 2023 MPU PowerPoint Presentation (English)
- July 25, 2023 MPU PowerPoint Presentation (Spanish)
In 2016, the HCAA initiated an update to validate the Phase 2 and 3 project elements to determine if conditions in 2016 matched the original findings of the 2012 AMPU. The intent was to verify forecasts, capacity needs and evaluate alternatives for the following key areas:
- Roadway/Curbside
- All Airsides
- Main Terminal
This new study is referred to as the 2012 Master Plan – 2016 Addendum. The documents serve as the consolidated guiding document representing all studies and validations completed. Not all components of the 2012 AMPU were restudied in this 2016 Addendum. If a project component was not restudied, the 2012 AMPU remains as the recommendation and will be referenced as such.
Section 1 of the 2016 Addendum provides a general overview of the process and updated project component recommendations that are different than the previous 2012 AMPU. Sections 2‐5 provide the detailed analysis and process concepts that were studied during the entire 2016 Addendum.
- 2012 Airport Master Plan - 2016 Addendum - Volume 1 (9.22.17)
- 2012 Airport Master Plan - 2016 Addendum - Volume 2 (9.22.17)
- 2012 Airport Master Plan - 2016 Addendum - Volume 3 (9.22.17)
- Master Plan Phase 2 renderings
- Master Plan Phase 2 animations
- HCAA Strategic Business Plan 2017 Update
- Phase 2 press release - 4.18.17
- Phase 2 - Board Workshop Presentation - 4.18.17
- Phase 2 Open House Press Release - 4.18.17
- Master Plan Phase 2 Outreach - 6.9.17
- June 9th Attendees Original Sign-In Sheets
- Master Plan Outreach Flyer - 6.27
- Master Plan Networking Sign-in Sheet - 6.27.17
- Master Plan Networking Event PowerPoint Presentations - 6.27.17
The 2012 Airport Master Plan Update (AMPU) began as a study designed to maximize the capacity and longevity of the existing Main Terminal facilities, while maintaining the level of service for which Tampa International Airport (TPA) is known. The 2012 AMPU was a holistic study of all Airport facilities. It was developed into a comprehensive 3 phase Capital Improvement Program:
Phase 1 – Decongestion
Phase 2 – Enabling
Phase 3 – Expansion
The Hillsborough County Aviation Authority (HCAA) Board adopted and approved the 2012 AMPU on April 4th, 2013.
- CATEX TPA Taxiway J Bridge Project
- TPA FONSI Letter
- TPA FONSI 2-13-14
- Skanska MTAC Redevelopment Program.pdf
- Austin Commercial Invites W/MBE subcontractors to submit pre-quals (11-10-14).pdf
- Graphical Renderings 11-5.zip
- Full Environmental Assessment 32MB.pdf
- Finding of No Significant Impact.pdf
- Attendance Sheet - Master Plan Subcontractor Outreach and Opportunities Fair (6-26-14) 176K.pdf
- Master Plan Executive Summary (11-22-13) 23.05MB.pdf
- Master Plan Update - Volume 1 (11-22-13) 44.16MB.pdf
- Master Plan Update - Volume 2 (11-22-13) 82.5MB.pdf
- Master Plan Update - Volume 3A (11-22-13) 43.22MB.pdf
- Master Plan Update - Volume 3B (11-22-13) 29.22MB.pdf
- Master Plan Public Meeting Presentation (11-21-13).pdf
- Business Plan PowerPoint Presentation (11-21-13).pdf
- Official Statement Refunding Transaction (11-15-13).pdf
- Report of the Airport Consultant (11-15-13).pdf
- Business Plan Final (11-15-13).pdf
- A New Day in Tampa Bay, Master Plan 2012 Book (5-7-13).pdf
- Graphical Renderings.zip
- Master Plan Fact Sheet (4-4-13).pdf
- Master Plan Update Press Release (4-4-13).pdf
- HCAA Board Briefing (4-4-13).pdf
- Master Plan Update Public Meeting (2-13-13).pdf
- HCAA Board Briefing (12-6-12).pdf
- News Release on Oct. 25 Public Meeting (10-22-13).pdf
- HCAA Board Briefing (10-4-12).pdf
- Vision 2020 Master Plan Update Public Meeting (4-11-12).pdf